Eighteen cameras, decided before a hole was drilled.

A two-storey waterfront events venue needed a camera plan that holds on a banquet night, in the rain and in an evacuation, in a hall whose layout changes for every event. Render rebuilt the venue as a twin from its drawing and its photographs, placed each camera only where it can really be mounted, and tested the plan the way a security consultant would: by simulation.

Render · case study Render Request access
01The brief
the place

Two event floors, a ground storey over the water, a beach and a street.

Seating is never fixed. Banquets, theatre rows, standing receptions and an empty hall each bring their own crowd, and drapes dress the ceiling on event nights.

the question

Where do the cameras go, and how far can the plan be trusted?

Not a coverage picture, but a decision: which mount, which aim, what it sees by day and by night, and what happens when something goes wrong.

The venue's twin at night: two glazed event floors lit warm from inside, people on the upper terrace, the building reflected in the dark water below.
02What was done
Twin

The building rebuilt from the CAD drawing, floor by floor, and checked against photographs of the site.

done
Placement

Cameras placed only on real ceilings, walls and poles, and aimed against each zone's requirement.

done
Intrusions

Thousands of simulated intrusions per scenario, with an operator watching and a steward responding.

done
Conditions

Noon, golden hour and night, rain, low sun and the compressed recording, measured on each camera's simulated view.

done
Events

Six seating layouts with their crowds and their dressing, and an evacuation for each.

done
Sensitivity

Every input with no published value pushed to both ends of its range, to find where the decision would change.

done
03What it found
intrusions

The steward arrives in time in about 97 runs in 100.

In the weakest scenario, across 2,000 simulated intrusions. With no cameras, none was interrupted.

aim

Five degrees off costs less than one percent.

An installer can miss the aim on any camera by five degrees and the plan barely moves.

event nights

No camera loses its view to the dressing.

Mounting the indoor cameras just below the lowest fold of the drapes kept every view clear in all six layouts.

what decides it

Response time, not the cameras.

The plan holds unless calling and sending a steward takes longer than about fifteen seconds. That is a staffing rule, not more hardware.

before drilling

One gap, found on paper.

The far end of the main footbridge was barely seen. The twin showed it before installation, where moving a camera costs nothing.

handover

Every camera on its own sheet.

Installers receive a drawing for each camera, its mount measured from the building's own columns, its bearing and its tilt, and a CAD file with every camera placed.

04How far to trust it

Every number says where it came from.

Each figure in the decision record is tagged: the drawing, a photograph, a published source, a measurement on the twin, or a simulation. What could not be measured is marked as assumed, tested across its range, and listed to confirm on site.

Nobody is identified. The plan works at the level of observing a scene, and it gives no compliance verdict.

Run the building first.

Render is in early access. Tell us about the place you want to plan.